Saudi Arabia now has more than 14,600 factories and approximately 3,200 mining licenses, reflecting steady growth in the Kingdom's industrial and mineral sectors. Mining-license applications are submitted through the Ta'adeen platform operated by the Ministry of Industry and Mineral Resources.
The application process is fully digital. Investors log in to Ta'adeen, open the Requests section, choose the license type, complete the form, upload the required documents, submit the application, and pay the application fee. Processing commonly takes between 30 and 90 days, depending on the license.
Fees and validity
An exploration license carries a SAR 5,000 application fee, a SAR 5,000 issuance fee, and a SAR 5,000 renewal fee. Its validity reaches up to five years for Class A and B minerals, while Class C may be valid for one year.
A building-materials license has a SAR 10,000 application fee, a SAR 20,000 issuance fee, and a SAR 20,000 renewal fee, with validity generally between 5 and 15 years. A small-mining license shares the same fee structure and can be valid for up to 20 years.
Renewal applications must be filed before expiry. The required advance period varies by license type, with some licenses needing submission at least 180 days before expiry. Mining licenses are issued under the Mining Investment Law, and certain licenses may run up to 30 years, with extensions subject to legal limits.
For residents and entrepreneurs, the figures point to expanding opportunities in manufacturing and mining, two pillars of the Kingdom's economic diversification drive. The streamlined digital licensing also lowers the barrier for local and international investors looking to enter these sectors.
Stay updated with the latest news, events, sports updates, business insights, real estate and lifestyle stories on Saudi Living — the leading online platform for residents, expats, and visitors in Saudi Arabia.
Follow Saudi Living for daily updates:
- Instagram - @saudiliving
- X - @saudiliving
- Facebook - @saudiliving
- YouTube - @saudiliving
Up Next

Non-Oil Growth Hits 1.9% as GDP Decline Narrows
Saudi non-oil activities grew 1.9% in Q3 2026 while real GDP contracted 3.8%, narrowing from Q2 as oil activity rebounded quarter-on-quarter.
Nov 9,2026
Arabian Drilling Lifts 2026 Capex to SAR 750-800M
Arabian Drilling raised its 2026 capital-expenditure forecast to SAR 750-800 million to speed up rig deployment and boost fleet activity in 2027.
Nov 8,2026
ADES Wins SAR 439.6M Offshore Rig Contracts
ADES Holding secures SAR 439.6 million in contracts to operate two offshore jack-up rigs for ONGC in India, with operations starting by early 2027.
Nov 8,2026
Tadawul Falls 0.78% as Nomu Climbs on 8 November
Saudi markets closed mixed on 8 November 2026, with the main index down 0.78% to 10,016.92 while the parallel market Nomu edged higher.
Nov 8,2026Related Stories
Don't Miss Similar Listings
Be the first to know when new stories on this topic are published.














