New self-consumption renewable-energy rules in Saudi Arabia now allow eligible residential and other consumers to install their own power systems and receive financial credit for surplus electricity exported to the grid. Systems may run on solar, wind, waste-to-energy, or biofuel, with generation and consumption taking place at the same facility.
The general framework covers capacities from 1 kW to 50 MW, while systems up to 2 MW connected to the distribution network fall under the small-scale solar PV framework. Consumers must own the facility or hold a legal right to use it. The electricity service provider installs a bidirectional meter, and surplus is credited through net billing.
Four categories
The rules set four categories. Category 1 (1–11 kW) needs no prior approval — the consumer simply files a notification with the service provider and pays no listed application or connection fee. Category 2 (above 11 kW up to 50 kW) requires a qualified contractor and a feasibility study, with a fee of SAR 2,300. Category 3 (above 50 kW up to 2 MW) also requires a network-impact assessment, with a fee of SAR 16,500. Category 4 (above 2 MW up to 50 MW) requires a study permit and generation licence from the Saudi Electricity Regulatory Authority; systems up to 4 MW pay SAR 35,000, while larger transmission-connected systems carry application fees of SAR 1,500 or SAR 5,000 and connection fees of SAR 15,000 or SAR 30,000 depending on size.
Surplus from residential systems is valued at 7 halalas, while other consumption categories are valued at 5 halalas. Credits can be carried forward for 12 months from accrual and used across multiple electricity accounts belonging to the same consumer.
For the community, the rules give households and businesses a clear path to cut electricity costs, with smaller rooftop systems facing minimal paperwork. Applications and notifications are handled through the electricity service provider, while larger projects also involve the Saudi Electricity Regulatory Authority.
Stay updated with the latest news, events, sports updates, business insights, real estate and lifestyle stories on Saudi Living — the leading online platform for residents, expats, and visitors in Saudi Arabia.
Follow Saudi Living for daily updates:
- Instagram - @saudiliving
- X - @saudiliving
- Facebook - @saudiliving
- YouTube - @saudiliving
Up Next

King Salman Stadium Early Works Bid Deadline Extended
The bid deadline for early works at King Salman International Stadium in Riyadh has been moved to 1 December 2026, giving contractors extra time to submit.
Nov 14,2026
3 Riyadh Projects Shine at World Smart City Awards 2026
Three Riyadh projects earned recognition at the 2026 World Smart City Awards in Barcelona, with Tawazoun winning the Infrastructure & Building Award.
Nov 14,2026
Saudi Arabia Hits 122.6 Million Tourists in 2025
Saudi Arabia recorded 122.6 million visitors in 2025 and SAR 303.7 billion in tourism spending, raising its 2030 target to 150 million.
Nov 14,2026
Council Reviews Economy and Health Transformation Plan
Saudi GDP hits SAR 4.9 trillion as the Kingdom advances its health transformation plan, moving ten clusters to the Health Holding Company.
Nov 13,2026Related Stories
Don't Miss Similar Listings
Be the first to know when new stories on this topic are published.














