Set Up Home Electricity in Saudi Arabia: Full Guide

4 min read
•
Nov 9, 2026
Share this article
Set Up Home Electricity in Saudi Arabia: Full Guide

Whether you've just signed a lease or you're building a brand-new home, getting electricity connected and registered in your name is one of the first practical steps to settling in. In Saudi Arabia, the process is handled directly through the Saudi Electricity Company, and the route you take depends on whether the property already has a working meter or needs a completely new connection. This guide from سعودي ليفنج walks you through both scenarios, the information you'll need, and the charges involved.

Existing property or rental: adding your account

If you're moving into a property that already has an installed meter, you don't need any physical rewiring work. Instead, you register the existing meter under your name through the Saudi Electricity Company website or mobile app. The path is straightforward:

  • Open My Services, then Account Management.
  • Select Add Account or Add Beneficiary.
  • Choose the tenant option.
  • Enter the meter details, pick your responsibility start date, accept the Consumption Agreement, and submit.

From the chosen start date, you become responsible for the consumption recorded on that meter, so make sure the date lines up with the beginning of your tenancy.

The tenant and owner sequence

There's an important order to follow. The property owner or primary beneficiary must declare the meter first. Only after the owner has done this can you be added as the beneficiary. If you reach the registration screen and the meter isn't available to add, it usually means the owner hasn't completed their declaration yet — a quick conversation with your landlord resolves it.

What information you'll need

Before you start, gather the essentials so you can complete the form in one sitting:

  • The meter or account number for the property.
  • Your identification details as the tenant.
  • Your registered tenancy information.

Note that this meter-declaration service does not require a separate government-portal login to complete — the registration is handled within the electricity company's own service. The official instructions for this service do not list a separate fee for declaring or registering the account.

New permanent connection for a new build

If you're constructing a new property, the process is more involved because the infrastructure must be created from scratch. You submit the request for a permanent connection through Balady or Modon, and this comes after you've obtained the building permit and the Coordination Certificate.

To be ready for connection, the site needs to meet several technical conditions:

  • A valid building permit.
  • A prepared meter location.
  • Completed earthing.
  • Full compliance with the Coordination Certificate's specifications for load, breaker, cable, and meter placement.

Published connection-work charges

For new permanent connections, there are published charges tied to the engineering and connection work. These include:

  • Preliminary study: SAR 25,000.
  • Planning, engineering, and supervision: SAR 75,000.
  • Low-voltage load division: SAR 1,000 including accessories and installation.

These figures apply to the connection-work side of a new project and are separate from your ongoing monthly consumption bills.

Tariffs, reconnection, and what to confirm

When it comes to the rates you'll pay for electricity and any service charges, it's best to verify the current figures directly, as exact residential consumption tariffs, meter-service charges, and reconnection charges are not something we'll quote here without official confirmation. You may see unofficial reconnection estimates circulating online — treat those with caution and rely only on the figures confirmed through the electricity company's official channels.

One confirmed date worth noting: a new electricity-service tariff is scheduled to take effect on 1 January 2027. There is no established 2026 tariff change in the official guidance, so plan around the current rates until the 2027 update arrives.

A quick checklist before you begin

  • Confirm whether your property already has a meter or needs a new connection.
  • For rentals, ask the owner to declare the meter first.
  • Have your meter number, ID, and tenancy details ready.
  • For new builds, secure the building permit and Coordination Certificate before applying via Balady or Modon.
  • Verify all tariffs and charges on the official portal before making payments.

With the right information prepared and the correct sequence followed, registering your electricity is one of the smoother parts of setting up a home in Saudi Arabia.


Stay updated with the latest news, events, sports updates, business insights, real estate and lifestyle stories on Saudi Living — the leading online platform for residents, expats, and visitors in Saudi Arabia.

Follow Saudi Living for daily updates:

Up Next

Paying Traffic Fines: Najm vs Absher Explained

Paying Traffic Fines: Najm vs Absher Explained

A clear guide to paying Saudi traffic fines through Absher, bank SADAD, and Efaa — and why Najm does not handle fine payments. Check discounts and receipts.

Nov 9,2026
Dependent Iqama Guide: Sponsoring Family in Saudi Arabia

Dependent Iqama Guide: Sponsoring Family in Saudi Arabia

A practical guide to sponsoring your spouse and children in Saudi Arabia: eligibility, Absher steps, required documents, fees, levies, and renewal.

Nov 9,2026
Family Visit Visa Saudi Arabia: Requirements & Steps

Family Visit Visa Saudi Arabia: Requirements & Steps

A practical guide to the Saudi family visit visa: who can sponsor, required documents, the Nafath application steps, processing time, and tracking.

Nov 9,2026
Final Exit Visa in Saudi Arabia: Process & Checklist

Final Exit Visa in Saudi Arabia: Process & Checklist

A practical guide to the final exit visa in Saudi Arabia: it's free, who issues it, iqama and passport validity, what to settle first, and how to apply.

Nov 9,2026