Whether you're moving into a brand-new build or taking over an existing apartment or villa, getting your home connected to the electricity network is one of the first practical steps of settling in. In Saudi Arabia, this is handled through the Saudi Electricity Company (SEC), which manages new connections, meter transfers, and service start-ups. This Saudi Living guide walks you through exactly what to expect, from the paperwork to the connection charges, so you can switch the lights on without surprises.
New Connection vs. Existing Meter
The first thing to work out is whether your property needs a brand-new physical connection or simply a start-of-service on a meter that's already installed. This single question determines everything about your application.
- New build or no meter: You'll apply for a permanent electricity service connection, which involves technical coordination and a connection charge based on your chosen breaker capacity.
- Existing dwelling or rental with a meter: If the property already has a meter, you don't need a new physical connection. Instead, you request a transfer of service or a start-of-service into your name, which is far simpler.
How to Apply for a Permanent Connection
You can apply through SEC's electronic Electricity Service Connection service or by visiting an SEC customer-service office. The government service itself is listed as free; what you pay is the actual connection cost, which depends on breaker capacity and the connection design.
The typical process runs like this:
- Submit your site information, site plan, and technical load schedule.
- Obtain SEC's coordination and technical approval for your connection.
- Complete the connection agreement.
- Pay the assessed connection amount.
- Complete the approved cabling and ensure the site is ready.
- Arrange meter installation and energization.
Documents and Requirements
Before applying, gather the paperwork that supports a safe, approved connection. Typical requirements include:
- A building permit or municipality approval for installing the service unit.
- Site information and a site plan.
- A technical load schedule for your property.
- Approved wiring and cable sizes.
- Compliance with all applicable safety requirements.
Note that SEC's published requirements don't list any single government app as a mandatory channel — use SEC's own electronic service and customer channels to apply and track your request.
Connection Charges to Expect
Connection charges scale with breaker capacity. SEC's published schedule includes, for example:
- 20 amperes / 13.8 kVA — SAR 828
- 30 amperes / 20.7 kVA — SAR 1,242
- 40 amperes / 27.6 kVA — SAR 1,656
- 50 amperes / 34.5 kVA — SAR 3,278
For larger properties or higher loads, the figures rise accordingly:
- 125 amperes / 86.25 kVA — SAR 10,350
- 150 amperes / 103.5 kVA — SAR 12,420
- 500 amperes / 345 kVA — SAR 60,375
- 800 amperes / 552 kVA — SAR 138,000
Because the final cost depends on your connection design, always confirm the exact assessed amount through SEC before paying.
Temporary Construction Connections
If you need power on a construction site before the permanent connection is in place, you can arrange a temporary service. This requires a signed temporary-service agreement and a consumption insurance deposit of SAR 50.
Reconnection and Other Fees
A few situational fees are worth knowing in advance:
- Reconnection after payment: SAR 50.
- Disconnection and reconnection requested by an official authority: SAR 200.
The available official material doesn't specify a general validity period for a permanent connection application, coordination certificate, or connection agreement, so it's wise to move through the steps without long delays.
A Note on Tariffs
A published tariff adjustment is scheduled to take effect on 1 January 2027. If you're budgeting for your monthly bills, keep that date in mind and confirm the latest rates through SEC's official channels, since tariffs can be updated over time.
Quick Tips for a Smooth Setup
- Confirm early whether your property has an existing active meter — it changes your entire path.
- Have your municipality approval and load schedule ready before applying.
- Request the exact assessed connection amount in writing before paying.
- Use only SEC's official electronic service and customer offices to avoid delays.
Stay updated with the latest news, events, sports updates, business insights, real estate and lifestyle stories on Saudi Living — the leading online platform for residents, expats, and visitors in Saudi Arabia.
Follow Saudi Living for daily updates:
- Instagram - @saudiliving
- X - @saudiliving
- Facebook - @saudiliving
- YouTube - @saudiliving
Up Next

Paying Traffic Fines with Najm and Absher Explained
A clear guide to paying Saudi traffic fines: why Najm doesn't collect fines, and how to pay through Absher, Efaa, and SADAD bank services.
Nov 18,2026
Dependent Iqama Guide: Sponsoring Family in Saudi
A practical guide to sponsoring your spouse and children in Saudi Arabia: dependent levy, iqama fees, health insurance, and Absher steps.
Nov 18,2026
Saudi Family Visit Visa: Requirements & Steps
A complete Saudi Living guide to the family visit visa: sponsor eligibility, required documents, steps via Nafath and MOFA, fees, insurance, and validity.
Nov 18,2026
Exit & Re-Entry Visa in Saudi Arabia: How to Apply
A practical guide to applying for an exit and re-entry visa in Saudi Arabia via Absher or Muqeem, including fees, conditions, and validity.
Nov 18,2026Related Stories
Don't Miss Similar Listings
Be the first to know when new stories on this topic are published.