Setting Up Home Electricity in Saudi Arabia: A Guide

Oct 1, 2026
Share this article
Setting Up Home Electricity in Saudi Arabia: A Guide

Whether you've just moved into a rented apartment or built a new home, getting the electricity set up correctly in your name is one of the first practical tasks you'll tackle in Saudi Arabia. The good news is that the Saudi Electricity Company has made most of the process digital, so for an existing meter you can usually finish everything from your phone in a few minutes. This Saudi Living guide walks you through registering an account, adding or declaring a meter, understanding connection fees for new properties, and reading your residential tariff so there are no surprises on your bill.

Registering Your Account

The first step is to create an account through the Saudi Electricity Company website or the Al-Kahraba app. Registration gives you a single dashboard to manage bills, monitor your consumption, and make payments. One convenient detail: for the standard account and beneficiary-registration steps covered here, you don't need to log in through Absher, Muqeem, Qiwa, Najiz, Nafath, Tawakkalna, or Etimad — you register directly with the Saudi Electricity Company. There is also no stated expiry on the account registration or the meter declaration itself.

Adding a Meter in a Rented or Existing Home

If you're moving into a home that already has a meter — which covers most tenants and buyers of existing properties — you simply link that meter to your account. The steps are straightforward:

  • Register or log in to the Saudi Electricity Company website or the Al-Kahraba app.
  • Open Account Management and select Add Beneficiary.
  • Enter the meter account number.
  • Choose your service start date.
  • Accept the consumption agreement and submit.

During this process you'll complete a meter declaration that identifies you as the beneficiary — either an owner, a non-beneficiary owner, or a tenant. This declaration is what enables bill management, consumption monitoring, and payment under your name.

Requesting a New Permanent Connection

For a newly built property that has never had power, you'll need a permanent connection rather than a simple meter transfer. You submit a service-delivery request through the Saudi Electricity Company website, Balady, or MODON, depending on the type of project. Before you apply, make sure the following are ready:

  • A valid building permit.
  • A coordination certificate.
  • A prepared meter location.
  • A completed earthing (grounding) system.

Having these in place before applying avoids delays, since the connection cannot be finalized until safety requirements are satisfied.

Understanding Connection Fees

Permanent connection fees are calculated The approximate rates are:

  • Above 1–30 kVA: SAR 60 per kVA
  • Above 30–60 kVA: SAR 95 per kVA
  • Above 60–120 kVA: SAR 120 per kVA
  • Above 120–500 kVA: SAR 175 per kVA
  • Above 500–4,000 kVA: SAR 250 per kVA

Keep in mind a recent regulatory change: for some connection arrangements, the traditional connection fees have been replaced by charges for feasibility studies, planning, engineering, and engineering supervision. What you actually pay depends on your project and its specific connection requirements, so it's wise to confirm the applicable charge for your case on the official Saudi Electricity Company portal.

Installation Timing

Once your payment is complete, the meter is installed within 20 days — provided that all safety requirements are met and there are no outstanding amounts on the account. Settling any dues and finishing your earthing and meter location in advance is the best way to keep that window short.

How the Residential Tariff Works

Saudi Arabia uses a tiered residential tariff, so your rate depends on how much you consume each month:

  • SAR 0.18 per kWh for consumption up to 6,000 kWh
  • SAR 0.30 per kWh for any consumption above 6,000 kWh.

This structure rewards moderate use, so households that manage air-conditioning carefully during the hot months can keep bills lower. Use the consumption-monitoring tools in your account to track usage before you cross that 6,000 kWh threshold.

Final Tips from Saudi Living

For most residents, adding an existing meter is a quick app task — have your meter account number and intended start date ready before you begin. If you're connecting a new build, gather your building permit, coordination certificate, meter location, and earthing system first, and verify the current fee structure on the official portal, since engineering-based charges may apply to your project. Register early, link your meter promptly, and keep your account free of dues to avoid any interruption to your supply.


Stay updated with the latest news, events, sports updates, business insights, real estate and lifestyle stories on Saudi Living — the leading online platform for residents, expats, and visitors in Saudi Arabia.

Follow Saudi Living for daily updates:

Up Next

Cost of Living in Rabigh: 2026 Budget Guide

Cost of Living in Rabigh: 2026 Budget Guide

A practical guide to the cost of living in Rabigh: rent, utilities, groceries, transport, and internet, plus realistic monthly budgets for one person.

Sep 30,2026
Cost of Living in Makkah 2026: Full Guide

Cost of Living in Makkah 2026: Full Guide

A practical 2026 guide to the cost of living in Makkah: rent, groceries, utilities, transport, and seasonal price changes near Masjid al-Haram.

Sep 30,2026
Moving to Rabigh: What to Know Before You Arrive

Moving to Rabigh: What to Know Before You Arrive

A practical guide to living in Rabigh on the Red Sea: rents, utilities, work permits, Iqama, dependents, and the government portals you'll need.

Sep 30,2026
Shipping & Moving Your Belongings to Saudi Arabia

Shipping & Moving Your Belongings to Saudi Arabia

A practical guide to shipping household goods to Saudi Arabia: customs exemptions, required documents, VAT, brokers, and what to expect on arrival.

Sep 30,2026
Setting Up Home Electricity in Saudi Arabia: A Guide | Saudi Living